Projects and run history
Keep recordings and successive results organized.
Project library
Search projects by name and rename the selected project from the library. Each project stores a copied recording, reconstruction parameters, active output and annotations.
Run history
The History inspector lists reconstruction runs with their dates and saved parameters. Open result switches the active model to a completed run. Interrupted runs without a final model remain visible but cannot be opened.
Annotations and switching results
Annotations belong to the current model coordinate system. Veyra prevents switching runs while annotations exist. Export them before removing them if you need to preserve that work.